Invitation to tender Removal of rubble from streets, public squares and roadsides in the amount of (8850) dinars.
  • Installation and maintenance of (350) lighting units in the Ma’in area.
  • Installation and maintenance of (300) lighting units in the Al-Muraijmat and Al-Hawiyah area.
  • Installation and maintenance of (300) lighting units in the Jreinat Al-Shawabkeh area.
  • Installation and maintenance of (200) lighting units in the Granada and Arish area.
  • Installation and maintenance of (250) lighting units in the Al-Faisaliah area.
  • Work is currently underway to maintain and install lighting units in the Kasbah of Madaba, which is approximately (3000).
  • The valleys and culverts have been cleaned and prepared. To welcome the winter season.
  • A box ferry was built in the El Nadeem Hospital area to drain rainwater from the valley that separates the Al Azayda neighborhood area from El Nadeem Hospital.
  • Work is underway to open a street above the ferry to connect the two areas to shorten the distance and facilitate the movement of cars.And citizens in both regions.
  • Also, a box culvert was built in the Wadi Al-Habis area, the eastern neighborhood, to drain rainwater and the removal of the pipe culverts because they did not absorb rainwater, as this site is collecting rainwater from the western, southern and northwestern regions of Madaba.
  • The health unit investment was offered in the amount of (6250) dinars.
  • Work on the southern travel complex was completed and it is now receiving buses. And buses
  • Work is currently underway to find a suitable place for the Ma’in bus stop.
  • The necessary maintenance has been carried out on the streets of the craft area and the installation of old lighting and operating units.
  • The existing rubble and waste in the craft area have been removed and the Kurdish scraps located at the entrance to the craft city have been removed.
  • The necessary maintenance has been carried out and the (3) public parks of the municipality have been rehabilitated. :-

    • Ahmed Qutaish Al-Azaida Park.
    • Al-Karama Park.
    • Prince Hamzah Park.
    • Trees were also planted and trimmed on the central islands and the sidewalks were painted.

    A tender was issued to purchase clothes, gloves and boots – for “cleaning and works” workers.

    • Since its new municipal council took over, the municipality has conducted a general cleaning campaign that included all areas, neighborhoods, streets, and squares for hours.Late at night
    • The municipality, through municipal works workshops, patched the streets and potholes.
    • The municipal council is sparing no effort in developing the work and drawing up policies and strategies that raise the level of municipal work required to the best in providing services to citizens, and the citizen has felt this through what has been accomplished on the ground.
    • The commercial stores and offices belonging to the municipality located on King Abdullah II Street were rented by public auction.
    • It was done. Conducting the necessary studies – and preparing plans to build warehouses of (18) on the plot of land No. (244) basin (14) and the area of the plot is (2815) m
    • the former slaughterhouse land for investment.
    • The municipality removed all banners from the city’s streets and areas, as well as pictures of the candidates.
    • Campaigns to combat stray dogs
    • Campaigns to combat rodents.
    • Distribution of approximately (1000) barrels to municipal areas for waste collection.
    • The municipality repaired the cranes designated for installing and maintaining lighting units, as they had been idle for two years.
    • The municipality repaired bulldozers that had been idle for two years.
    • The municipality also installed the Zain Track electronic system to monitor the movement of vehicles to control fuel spending. The result was abundance(3600) liters of diesel each month, and it is the first municipality to install this system.
    • The municipality issued a magazine called “Madaba Magazine” under the title “Social – historical – archaeological, tourism, health – and literary topics, as the municipality is interested in culture and intellectuals.

    A tender was issued to build commercial warehouses on the municipal slaughterhouse land. The number of old warehouses is (18) at a cost of (150,000) thousand dinars and funding from the municipal fund.

    • Work is underway to build a cultural center (for children) on the plot of land adjacent to the hall of the late Ahmed Qutaish in cooperation between the municipality and the Zaha Cultural Center.
    • Constructing an environmental lodge on the plot of land owned by the municipality and located near the cultural village on Ma’in Road, at a cost of (80,000) One thousand euros from the European Union, and ownership will then return to the municipality of Madaba.
    • A tender for opening and paving Madaba’s streets in the amount of (45,000) thousand dinars and an area of (90,000) square metres, in addition to constructing box culverts in critical locations to remove damage to citizens’ homes.
    • Maintenance of streets and sidewalks (patches) in Madaba and the areas at a cost (15,000) thousand dinars, as (300) tons of asphalt mixture were used
    • preparing the graves, providing them with tiles, and building graves in Madaba and the regionsAt a cost of (30,000) thousand dinars, as the work includes (excavations, pouring slabs, building graves).
    • Maintenance of the Water Authority’s excavations at a cost of (20,000) thousand dinars using asphalt mixture.
    • Maintenance and painting of municipal buildings and areas at a cost of (8000) Dinars
    • Painting the sidewalks and edges of the main streets of the city and in various locations at a cost of (5,000) dinars.
    • Various maintenance work for municipal buildings at a cost of (2,000) dinars
    • Purchasing and installing traffic signs to regulate traffic at a cost of (35,000) one thousand dinars.
    • Preparing the site of a popular market for vegetable stall owners at a cost of (4000) dinars.
    • Expanding the governorate roundabout (Martyr Wasfi al-Tall) to alleviate the traffic crisis at a cost of(1000) dinars.
    • Relocating the livestock market and fencing the site at a cost of (1000) dinars. 

    Proposed future projects

    • A project to establish a number of (21) commercial warehouses on the land of the old municipal slaughterhouse at a cost of (400,000) thousand dinars.
    • Construction of a container factory at a cost of (50,000) thousand dinars.
    • Roofing valleys and open canals at a cost(200,000,000) thousand dinars.
    • Expansion of the craft area by purchasing new pieces at a cost of (1,000,000,000) million dinars.
    • Purchasing machinery for the Department of Services and Engineering Works such as (Baku, roller, dumper) in order to raise the level of service provided to citizens at a cost (400,000) thousand dinars.
    • Purchase of a sewage tank to serve the municipal slaughterhouse at a cost of (100,000) thousand dinars.
    • Tender for opening and paving streets to serve the regions at a cost of (250,000) thousand dinars.

    Municipal Council achievements

    Inviting a tender for opening and paving with a value of (362,000) thousand dinars and box containers.

    • Containers were purchased for the amount of (82) thousand dinars, and (200) containers were distributed in the Kasbah and the regions, and there are (100) containers that will be distributed very soon.
    • Invitation to tender for the removal of rubble from streets, public squares and roadsides for an amount of (8850) dinars.
    • Installation and maintenance of (350) lighting units in the Ma’in area.
    • Installation and maintenance of (300) lighting units in the Al-Muraijmat and Al-Hawiyah areas
    • Installation and maintenance of (300) lighting units in the Gharinat Al-Shawabkeh area.
    • Installation and maintenance of (200) lighting units in the Granada and Al-Arish area.
    • Installation and maintenance of (250) lighting units in the Al-Faisaliah area.
    • Work is currently underway to maintain and install lighting units in the Kasbah of Madaba, which are approximately 3000.
    • The valleys and culverts were cleaned and prepared to receive the winter season.
    • A box culvert was constructed in the Al-NadimHospital area to drain rainwater from the valley that separates the Al-Azayda neighborhood from Al-Nadim Hospital.
    • Work is underway to open a street above the ferry to connect the two areas to shorten the distance and facilitate the movement of cars and citizens in both areas.
    • A box culvert was also built in the Wadi Al-Habis area, the eastern neighborhood, to drain rainwater and the pipe culverts were removed because they did not absorb rainwater, as this site collects rainwater from the western, southern and northwestern regions of Madaba.
    • The health unit investment was offered at (6250) dinars
    • Work on the Southern Travel Complex has finished and it is now receiving buses and coaches
    • Work is currently underway to find a suitable place for the Ma’in bus stop.
    • The necessary maintenance was carried out on the streets of the craft area, and old lighting and operating units were installed
    • The existing rubble and waste in the craft area were removed, and the Kurdish scraps located at the entrance to the craft city were removed.

    The necessary maintenance and rehabilitation of the municipality’spublic parks (3) were carried out:

    • Ahmed Qatish Al-Azayda Park.
    • Karama Park.
    • Prince Hamzah Park.
    • Trees were also planted and trimmed on the central islands, and the sidewalks were painted.

     

    A tender was issued to build commercial stores on the land of the old municipal slaughterhouse, numbering (18) stores, at a cost of (150,000) thousand dinars and funding from the municipal fund.

    • Work is underway to build a cultural center (for children) on the plot of land adjacent to the hall of the late Ahmed Qutaish, in cooperation between the municipality and the Zaha Cultural Center.
    • Establishing an environmental lodge on a piece of land owned by the municipality, located near the urban village on Ma’in Road, at a cost of (80,000) thousand euros from the European Union, and ownership will then return to the Municipality of Madaba.
    • A tender for opening and paving the streets of Madaba in the amount of (45,000) thousand dinars and an area of (90,000) square meters, in addition to constructing box culverts in critical locations to remove damage to citizens’ homes.
    • Maintenance ofstreets and sidewalks (patches) in Madaba and the regions at a cost of (15,000) thousand dinars, where (300) tons of asphalt mixture were used.
    • Preparing graves, providing them with slabs, and building graves in Madaba and the regions at a cost of (30,000) thousand dinars, as the work includes (excavations, pouring slabs, building graves).
    • Maintenance of the Water Authority’s excavations at a cost of (20,000) thousand dinars using asphalt mixture
    • Maintenance and painting of buildings belonging to the municipality and regions at a cost of (8000) dinars
    • Painting the sidewalks and edges of the main streets of the city and in various locations at a cost of (5000) dinars.
    • Various maintenance works for municipal buildings at a cost of (2000) dinars
    • Purchasing and installing traffic signs to regulate traffic at a cost of (35,000) thousand dinars.
    • Preparing a popular market site for vegetable stall owners at a cost of (4000) dinars.
    • Widing the governorate’s roundabout (Martyr Wasfi al-Tall) to alleviate the traffic crisis at a cost of (1000) dinars.
    • Moving the livestock market and fencing the site at a cost of (1000)dinars.

    Proposed future projects

    • A project to establish (21) commercial stores on the land of the old municipal slaughterhouse at a cost of (400,000) thousand dinars.
    • Establishing a container factory at a cost of (50,000) thousand dinars.
    • The roof of valleys and open canals costs (200,000) thousand dinars.
    • Expanding the crafts area by purchasing new pieces at a cost of (1,000,000) million dinars.
    • Purchasing machinery for the Department of Services and Engineering Works, such as (Baku, roller, dumper) in order to raise the level of service provided to citizens, at a cost of (400,000) thousand dinars.
    • Purchasing a sewage tank to serve the municipal slaughterhouse at a cost of (100,000) thousand dinars
    • Tender for opening and paving streets to serve the regions at a cost of (250,000) thousand dinars.